09/17/2025
9/17/2025: The water main break has been repaired and water is back on. As the tower fills there may be low pressure above the hill but the pressure will increase throughout the day.
09/16/2025
9/16/2025: The Village has had another water main break on 1st Street. There is a crew on site and working on making the repair to get service restored by morning. As this line feeds the water tower residents above the hill will once again have low or no water pressure until the repair has been made and the tower refills.
09/16/2025
The Village Water Department is issuing a precautionary boil order after last night's water main break. Remember to bring your water to a rolling boil for 5 minutes. Results will come back in the next 24-48 hours when samples have cleared.